Ship to Ship - Progress page
The Intergalactic "Aldis Lamp"*
See the Videos!
8/16/02 See the water cooled starside server. (Note, the legs are bent that way to fit into a "ActionPacker" plastic box).
8/14/02 Just in the nick of time, the Modulator works (4 meg videos #1, #2) (Note that the mirror is not installed in the searchlight in these videos)
8/9/02 The system is being built in my yard. The power supply is comming together. I'm testing it with a big resistor in a bucket of water. I had to make a .1 ohm 200 watt resistor for the main ballest. We have the extention pipe, called a "spool".
8/8/02 The tracking controller is working.
7/31/02 We have Stickers
7/30/02 I have a new office.
7/22/02 Time flies when you have to move to a new house. Luckly I got an even bigger house and yard.
6/21/02 Marc has welded the lamp adapter and painted it.
6/17/02 The cooling system test stand - The great arcbulb.
6/12/02 The camp layout! - a really bad sketch of the transmitter
6/11/02 some system block drawings are online (PDFs)
- The overview block
- The StarSide block, and liquid cooler system
- The earthSide block
6/6/02 The STS project will have "Playa coins" to give out to those who have the complete experience.
5/31/02 We are mapped into "the unknown" at 330 degrees, 2300 feet.
4/22/02 we have a solid copper radiator for the liquid cooling heat exchanger.
4/4/2001 We have a tank spotlight!
1/16/2002: The Mount has arrived!